The workpiece is placed on the workbench, and the spot welding is moved by the six-axis robot grasping the welding pliers. The personnel are only responsible for feeding and feeding, which greatly reduces the labor intensity and can be completed by ordinary female workers.
With the use of double station with robot point Huang, bright connection and loading and unloading synchronous, daily production capacity increased to 3000 pieces, efficiency increased by 250%
After the 3D simulation of the technical department, the T installation integrates four common air conditioning baseboards into one set of tooling, and then matches them with double tooling, which can meet the requirement of no tooling switch for existing products throughout the day and save 2 hours a day.
Through integration, two machine workstations can be put into operation by one person. Two work stations can meet the existing capacity and save 4 operators
Through the application of electrode grinding station, the grinding times will be calibrated, the machine automatically shift grinding, reduce manual intervention, to ensure that the calibrated process parameters have been fully applied, welding quality has been recognized by customers;
Workstation realizes the idea of intelligent manufacturing, using bus control, all the electrical parameters of the bright machine grab, and through curve comparison, OK and NG signal transmission to the supreme machine, data detection, storage and traceability, has been recognized by the final customer;
Model | MUNS-80 | MUNS-100 | MUNS-150 | MUNS-200 | MUNS-300 | MUNS-500 | MUNS-200 | |
Rated Power(KVA) | 80 | 100 | 150 | 200 | 300 | 400 | 600 | |
Power Supply(φ/V/Hz) | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | |
Rated Load Duration (%) | 50 | 50 | 50 | 50 | 50 | 50 | 50 | |
Maximum Welding Capacity(mm2) | Open Loop | 100 | 150 | 700 | 900 | 1500 | 3000 | 4000 |
Closed Loop | 70 | 100 | 500 | 600 | 1200 | 2500 | 3500 |
A: We are a manufacturer of welding equipment for more than 20 years.
A: Yes, we can
A: Xiangcheng District, Suzhou City, Jiangsu Province, China
A: In the guarantee time(1 year), we will send the spare parts to you for free. And provide the technical consultant for any time.
A: Yes, we do OEM.Welcome global partners.
A: Yes. We can provide OEM services. Better to discuss & confirm with us.