The ADR-20000J double-head capacitor energy storage projection welding machine we chose has DC output, extremely high peak value, and extremely short discharge time. It can break through the aluminum-silicon coating of the thermoformed plate and achieve a strong and standardized welding effect. It fully meets the needs of A-pillars and Welding requirements for central channel nuts;
Single power supply double head structure, one set of large cylinder head, one set of small cylinder head, the big head is used for M10-M14 nut welding, the small head is used for M6-M10 nut welding, one equipment covers All products meet the investment budget;
Add a nut conveyor, which only takes 0.5 seconds to convey nuts, without manual intervention, avoiding the risk of pressing hands, and increasing the tempo by 20%;
Add sensors to detect when the nut is in place, and add counting function and in-position reset function in the system to ensure that the set number of welding is completed before entering the next process, avoiding the risk of missing and missing welding;
Central channel nut washer projection welding
A-pillar nut projection welding
Threshold nut projection welding site
Door sill nut projection welding
Low carbon steel square nut projection welding
Stainless Steel Hex Nut Projection Welding
Projection welding of thermoformed steel bolts
Projection welding of high strength steel bolts
Galvanized sheet hex nut projection welding
Projection welding of high strength steel bolts
Projection welding of thermoformed steel square nuts
Round Nut Ring Projection Welding
Projection welding of nuts under the chassis
A-pillar nut projection welding
Projection welding of automobile chassis tower nuts
B-pillar nut projection welding
Low voltage capacitance | Medium voltage capacitance | ||||||||
Model | ADR-500 | ADR-1500 | ADR-3000 | ADR-5000 | ADR-10000 | ADR-15000 | ADR-20000 | ADR-30000 | ADR-40000 |
Store energy | 500 | 1500 | 3000 | 5000 | 10000 | 15000 | 20000 | 30000 | 40000 |
W.S | |||||||||
Input power | 2 | 3 | 5 | 10 | 20 | 30 | 30 | 60 | 100 |
KVA | |||||||||
Power Supply | 1/220/50 | 1/380/50 | 3/380/50 | ||||||
φ/V/Hz | |||||||||
Max Primary current | 9 | 10 | 13 | 26 | 52 | 80 | 80 | 160 | 260 |
A | |||||||||
Primary Cable | 2.5㎡ | 4㎡ | 6㎡ | 10㎡ | 16㎡ | 25㎡ | 25㎡ | 35㎡ | 50㎡ |
mm² | |||||||||
Max short-circuit current | 14 | 20 | 28 | 40 | 80 | 100 | 140 | 170 | 180 |
KA | |||||||||
Rated Duty Cycle | 50 | ||||||||
% | |||||||||
Welding Cylinder Size | 50*50 | 80*50 | 125*80 | 125*80 | 160*100 | 200*150 | 250*150 | 2*250*150 | 2*250*150 |
Ø*L | |||||||||
Max Working Pressure | 1000 | 3000 | 7300 | 7300 | 12000 | 18000 | 29000 | 57000 | 57000 |
N | |||||||||
Cooling Water Consumption | - | - | - | 8 | 8 | 10 | 10 | 10 | 10 |
L/Min |
Model |
ADB-5 |
ADB-10 |
ADB-75T |
ADB100T
|
ADB-100 |
ADB-130 |
ADB-130Z |
ADB-180 |
ADB-260 |
ADB-360 |
ADB-460 |
ADB-690 |
ADB-920 |
|
Rated Capacity |
KVA |
5 |
10 |
75 |
100 |
100 |
130 |
130 |
180 |
260 |
360 |
460 |
690 |
920 |
Power Supply |
ø/V/HZ |
1/220V/50Hz |
3/380V/50Hz |
|||||||||||
Primary Cable |
mm2 |
2×10 |
2×10 |
3×16 |
3×16 |
3×16 |
3×16 |
3×16 |
3×25 |
3×25 |
3×35 |
3×50 |
3×75 |
3×90 |
Max Primary Current |
KA |
2 |
4 |
18 |
28 |
28 |
37 |
37 |
48 |
60 |
70 |
80 |
100 |
120 |
Rated Duty Cycle |
% |
5 |
5 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
Welding Cylinder Size |
Ø*L |
Ø25*30 |
Ø32*30 |
Ø50*40 |
Ø80*50 |
Ø100*60 |
Ø125*100 |
Ø160*100 |
Ø160*100 |
Ø160*100 |
Ø200*100 |
Ø250*150 |
Ø250*150*2 |
Ø250*150*2 |
Max Working Pressure(0.5MP) |
N |
240 |
400 |
980 |
2500 |
3900 |
6000 |
10000 |
10000 |
10000 |
15000 |
24000 |
47000 |
47000 |
Compressed Air Consumption |
Mpa |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
0.6-0.7 |
Cooling Water Consumption |
L/Min |
- |
- |
6 |
6 |
8 |
12 |
12 |
12 |
12 |
15 |
20 |
24 |
30 |
Compressed Air Consumption |
L/Min |
1.23 |
1.43 |
1.43 |
2.0
|
2.28 |
5.84 |
5.84 |
5.84 |
5.84 |
9.24 |
9.24 |
26 |
26 |
A: We are a manufacturer of welding equipment for more than 20 years.
A: Yes, we can
A: Xiangcheng District, Suzhou City, Jiangsu Province, China
A: In the guarantee time(1 year), we will send the spare parts to you for free. And provide the technical consultant for any time.
A: Yes, we do OEM.Welcome global partners.
A: Yes. We can provide OEM services. Better to discuss & confirm with us.