The copper mesh die-cutting stage realizes a one-mold two-piece process, which improves the utilization rate of the copper mesh and reduces waste
The equipment uses a precision DC welding machine to weld and fix the copper mesh, and welds 2 to 6 solder spots at the same time. The welding parameters can be monitored. After welding, the product has no traces, no protrusions, firmness and no looseness, and the good product rate is over 99.9%
Realize automatic die-cutting of roll materials, automatic positioning welding, automatic unloading and plate placement, and realize the operation of the whole station by one person, which solves the previous man-sea station technique, greatly reduces labor costs, and breaks through the cumbersome and troublesome manual placement of copper mesh. Low-efficiency and low-precision operations, precise placement, greatly improved production quality and efficiency, the daily output of a single device exceeds 12,000 pieces, and the efficiency has increased by 3 times on the original basis;
This equipment can continue to be expanded to carry out a complete set of automatic processes such as automatic gluing and lid closing, and has a ready-made solution;
Ultra thin VC uniform temperature plate welding
Ultra thin VC uniform temperature plate welding
Ultra thin VC uniform temperature plate welding
Copper mesh and copper sheet uniform temperature plate welding
Copper mesh and copper sheet uniform temperature plate welding
Copper mesh and copper sheet uniform temperature plate welding
Model | MUNS-80 | MUNS-100 | MUNS-150 | MUNS-200 | MUNS-300 | MUNS-500 | MUNS-200 | |
Rated Power(KVA) | 80 | 100 | 150 | 200 | 300 | 400 | 600 | |
Power Supply(φ/V/Hz) | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | 1/380/50 | |
Rated Load Duration (%) | 50 | 50 | 50 | 50 | 50 | 50 | 50 | |
Maximum Welding Capacity(mm2) | Open Loop | 100 | 150 | 700 | 900 | 1500 | 3000 | 4000 |
Closed Loop | 70 | 100 | 500 | 600 | 1200 | 2500 | 3500 |
A: We are a manufacturer of welding equipment for more than 20 years.
A: Yes, we can
A: Xiangcheng District, Suzhou City, Jiangsu Province, China
A: In the guarantee time(1 year), we will send the spare parts to you for free. And provide the technical consultant for any time.
A: Yes, we do OEM.Welcome global partners.
A: Yes. We can provide OEM services. Better to discuss & confirm with us.